Disruptions

Bus

Reservoir Road and Penny Hill Lane, Ulley (Rotherham) -  11/01; 12/01; 13/01; 14/01; 16/01 to 21/01; 23/01 to 28/01; 30/01 to 04/02; 06/02 to 11/02; 13/02 to 18/02; 20/02 to 25/02; 27/02 to 04/03; 06/03 to 11/03;

Posted: 11/01/2022 00:00:00

Affected dates: 11/01/2022; 12/01/2022; 13/01/2022; 14/01/2022; 16/01/2022 to 21/01/2022; 23/01/2022 to 28/01/2022; 30/01/2022 to 04/02/2022; 06/02/2022 to 11/02/2022; 13/02/2022 to 18/02/2022; 20/02/2022 to 25/02/2022; 27/02/2022 to 04/03/2022; 06/03/2022 to 11/03/2022;

Reason: Road closed

Description: Reservoir Road and Penny Hill Lane will be closed for carriageway resurfacing from Monday to Friday between Tuesday 11 January 2022 and Friday 11 March 2022 at 09:40 to 15:30. Reservoir Road will be closed for four weeks (to Friday 4 February 2022) and Penny Hill Lane will be closed the following five weeks on (to Friday 11 March 2022). The 09:15 departure from Dinnington to Rotherham and the 16:30 departure from Rotherham to Dinnington will operate as normal.

Impact: Unknown

Mode:  Bus
TM Travel:  20,
Service 20 towards Dinnington to operate as normal to Pleasley Road then divert via continuing on Pleasley Road, Main Street, Aston Lane, Aughton Lane, Worksop Road, Aston Way, Worksop Road, Todwick Road, Common Road, and Long Road before continuing normal route on Common Lane.
Service 20 towards Rotherham to operate as normal to Common Lane then divert via Long Road, Common Road, Todwick Road, Worksop Road, Aston Way, Worksop Road, Aughton Lane, Aston Lane, Main Street and Pleasley Road before continuing normal route on Pleasley Road.
Affected stops:
Main Street/Penny Hill Lane (370030013)
Main Street/Poynton Avenue (370030012)
Main Street/Poynton Avenue (370035074)
Main Street/Reservoir Road (370030014)
Main Street/Turnshaw Road (370030011)
Penny Hill Lane/High Lane (370035949)
Penny Hill Lane/High Lane (370035993)
Reservoir Road/Green Lane (370030015)